July 26th, 2025Road wrap up
Victoria’s $964 million 2024/25 road maintenance program wrapping up this month.
Hundreds of kilometres of road across the state have been repaired, resurfaced or rebuilt to keep Victorians moving delivering more reliable journeys for local drivers, tourists, and freight operators.
Crews have inspected roads and responded to calls from local communities – 24 hours a day, seven days a week, undertaking repairs on more than 211,000 potholes and mowing and slashing more than 50,000 kilometres of grass.
Almost 41,000 signs have been repaired or replaced, and crews have cleaned over 20,727 square metres of graffiti from the road network.
Workers have inspected more than 8,000 structures on the road network, including bridges and culverts to ensure they continue to be operational and more than 3,000 safety barriers have been repaired on major highways.
Approximately 70 per cent of this program was delivered on roads and roadsides across regional Victoria – with major works delivered along the Great Alpine Road, the Mallee Highway, the Monaro Highway, the Surf Coast Highway and the Western Highway.

